Driveway permits by city.

A driveway usually needs three separate approvals: a city or county permit, a right-of-way check, and — if your community has one — HOA approval. We pour in Miami-Dade and Broward. Find your city below.

What gets approved

City or county permit

Covers zoning, drainage, and inspections on your property.

Right-of-way check

The apron, sidewalk, or swale may need separate engineering approval.

HOA approval

Private community rules on finish, color, and layout. Separate from the permit.

City by city

Choose your city

Search or filter, then press a city for its permit, right-of-way, and HOA details.

15 locations

Permit
County building or zoning review is generally required.
Right-of-way
Public Works review if the approach, swale, or sidewalk is touched.
HOA
HOA approval is separate — follow the community’s private rules.
Miami-Dade permit information

Permit
Standalone residential driveway permit; plans may be requested.
Right-of-way
Right-of-way permit for sidewalk or City-property work.
HOA
HOA approval is separate.
City of Miami permits

Permit
Permit required for a new driveway or changes to material or shape.
Right-of-way
Swale or tree work adds Public Works review.
HOA
City architectural review can apply even without an HOA.
Coral Gables Development Services

Permit
City review required; survey and plan may be requested.
Right-of-way
Approach gets Public Works review and inspection.
HOA
HOA approval letter required with the application when applicable.
Doral permitting

Permit
Driveway permit application signed by owner and contractor.
Right-of-way
Streets Department review for approach, sidewalk, and curb work.
HOA
Confirm HOA approval separately.
Hialeah Building Department

Permit
City permit review for driveway work on private property.
Right-of-way
Separate review for streets, sidewalks, and easements.
HOA
Condo/HOA approval is private, not a substitute.
Miami Beach Public Works permits

Permit
Driveway and slab permit checklist with site details.
Right-of-way
Sidewalk and approach need grading and swale drainage attention.
HOA
HOA awareness document is part of the permit package.
Miami Gardens Building Services

Permit
Reviewed through the City’s development and permitting process.
Right-of-way
Engineering review for right-of-way standards and drainage.
HOA
Confirm both City and HOA approval before scheduling.
Fort Lauderdale engineering permits

Permit
Driveway checklist with Building, Zoning, and Engineering review.
Right-of-way
Concrete in the swale may need extra forms — that area can hold utilities.
HOA
HOA awareness affidavit is part of the application, even for non-HOA homes.
Pembroke Pines permit forms

Permit
Driveway permit checklist; current survey and plan may be required.
Right-of-way
Swale, sidewalk, and curb are subject to City standards.
HOA
HOA may set finish, color, and layout rules.
Hollywood permitting services

Permit
Application package for slabs and driveways, with zoning and site requirements.
Right-of-way
Check whether approach or easement work needs Engineering review.
HOA
HOA affidavit is in the City’s materials; community approval may still be needed.
Miramar permit applications

Permit
Engineering and Zoning review, plus an impervious lot-coverage calculation.
Right-of-way
Show swale, sidewalk, and right-of-way work for Engineering.
HOA
Architectural approval is separate.
Coral Springs Building Department

Permit
Reviewed through Building, Engineering, and Zoning.
Right-of-way
Approach and swale must meet right-of-way and drainage standards.
HOA
Check association rules before choosing the finish or footprint.
Pompano Beach applications

Permit
Engineering permit for new or repaired paving and curbing.
Right-of-way
Improvement-district properties may need another approval first.
HOA
HOA approval is separate.
Plantation permit services

Permit
Concrete driveway checklist; signed and sealed survey may be required.
Right-of-way
Utility easement work may need a hold-harmless agreement.
HOA
Get association approval before finalizing the design.
Davie building permits

Requirements and forms change — confirm with the city before construction.

Last checked: October 2026.

Common questions

Usually yes. Open your city above and confirm with its permit office.

No. A permit covers public codes; HOA approval covers private community rules. You may need both.

The apron connecting the driveway to the road — it often gets separate engineering review.

Property address, driveway size, desired finish, and any HOA instructions.